Feature - Mass Fill BO by Batch Trial Fill with System Date + or - Number of Days Option
Release Date: 2/1/2021
Version: 8.5 & Up
This enhancement applies to COP -> Processing -> Fill Backorders -> Mass -> By Batch -> Mass -> Process -> Trial Fill, the system prompt for "2. Cut-off Date." In the past, it supports either a specific date, or "All" if the user presses Enter on that field. In this enhancement, the user can press the F1 key at the field "2. Cut-off Date" field, which means to the user "System Date." In addition, the system will prompt the user to enter the number of days to adjust. See sample screen below:
- Zero: The user can enter value zero, which means to use the system date.
- Positive: The user can enter a positive value. That means to use the system date + ??? days (in the future). For example, entering a value of +7 instructs the system to make the cut-off date one week later.
- Negative: The user can enter a negative value. That means to use the system date - ??? days (in the past). For example, entering a value of -365 instructs the system to make the cut-off date 1 year ago.
The primary purpose of this enhancement is to allow users to run Mass Fill BO Trial Fill through deferred processing. The following is a sample of the report legend:
- Cut-off Date: 99/99/99 - The user enters a specific cut-off date.
- Cut-off Date: 99/99/99 (System Date) - The user chooses F1=System Date and uses 0 for adjustment.
- Cut-off Date: 99/99/99 (System Date) + 999 Day(s) - The user chooses F=System Date and uses +999 days for adjustment. (Same principle for minus example.)
- For All Dates - The user presses Enter for "All."
Modified Programs: CPFBTRIP, CPFBTRIS
EMK
Related Articles
CP0701 Customer Order Processing Fill Backorders
Fill Backorders Application Overview It is not unusual for a company to run low on stock of certain items and be required to backorder part of a customer's order. If this happens frequently enough, a large number of order remnants can accumulate on ...
BM1501 Bill of Material Feature/Option Configuration Maintenance
BM1501 Bill of Material Feature/Option Configuration Maintenance ← Bill of Material / Work Order Plus Feature/Option Configuration File Maintenance Application Overview The Feature/Option Configuration File Maintenance application enables the user to ...
Avg Days Pay YTD in Customer File Calculation Issue
It is a known issue that the "Avg Days Pay YTD" field in the customer file may not be correct. There are various reasons for the average days pay not to calculate correctly. One reason is that this field, as it was originally designed, does not ...
BM1601 Bill of Material Feature/Option Configuration Inquiry
BM1601 Bill of Material Feature/Option Configuration Inquiry ← Bill of Material / Work Order Plus Feature/Option Configuration Inquiry Application Overview The Feature/Option Configuration Inquiry application provides an easy way to display various ...
Can I Mass Change Inventory Transfer Batches Estimated Date Time and Assign to Different User?
Release Date: 12/19/2024 Version: 8.2 & Up Q - From time to time, our inventory clerk can get busy or his schedule does not allow time to finish all his work. Say, for example, he has 25 transfer tickets that are assigned to him for Dec 18, 2024, and ...