Feature - Deferred Processing Multiple Times Per Day

Feature - Deferred Processing Multiple Times Per Day

Release date: 03/31/2016

Some reports may need to be run multiple times each day.  Prior to this release, a separate deferred process had to be created for each time during the day that the report needed to be run.  This new feature allows for running a deferred report multiple times per day, at specified intervals within a specified time frame, all in one deferred process:



In the example above, the report will be run every 15 minutes between 7:00am and 5:30pm, Monday through Friday.  

You can specify minutes between running as low as 1 and as high as several hours (e.g., 120 is 2 hours).

Military times are specified, between 00:00 and 23:59.  The stop time must be greater than the start time.  If, for example, you want to schedule a report between 4:00pm and 2:00am the next morning, you need to set up two of these daily deferred processes, one repeating between 16:00 and 23:59 and one between 00:00 and 02:00.

If the report is generated many times per day, you may wish to consider modifying EL800U.CFG to separate these reports from others.  See the Knowledge Base article titled Feature - Automatic Archiving of Spooled Reports in Elliott v8.0.

Modified programs: BIDRPTW, BIDRPTM, NWSMDFRP, NWSMRPTP
JEG


    • Related Articles

    • Deferred Processing Icon Disappears from Task Tray and Multiple Deferred Sessions Are Running

      Release Date: 03/04/21 Modified Date: 02/08/24 Version: 7.5 & Up Q - Our Deferred Processing icon is disappearing from the task tray in the desktop bottom right corner. As a result, we thought Deferred Processing was not running and launched Deferred ...
    • Btrieve Error 80 In Deferred Processing

      Q - In Deferred Processing, we encounter the following error: Btrieve Error 080 on Order Header File This has been happening for the last 30 days off and on. What might cause this to happen? A - This is what Btrieve Error 80 means based on PSQL ...
    • Deferred and PostOffice Processing in Elliott V8.6

      Version 8.6 Release Date: 4/28/23 Revised: 6/26/23 Overview Elliott V8.6 brings the following changes to Deferred Processing and PostOffice Processing: You no longer can specify Deferred Processing with any other output option. PDF PostOffice ...
    • Error 114 with GUIUTL32.LBR\GUIUTIL.int in Deferred Processing

      Release Date: 04/09/2018 Q - We are receiving Error 114 in Defer Processing 2 - 3 times a week with the following messages: Executiion error : file 'GUIUTL32.LBR\GUIUTIL.int error code: 114, pc=EE, call=4, seg=4 (Signal 11) See sample screen below: ...
    • Deferred Process in V8 Runs Right Away

      Q - I'm trying to set up Shipment Conf Emails in Elliott V8 to run on a deferred basis. I select Disk to spool the report, and Defer. See screen shots below. Then I click "go," and the program starts running immediately. What am I doing wrong? A - In ...