Feature - Add Printing by First Line Bin to DYO Packing List
Release date: 4/12/2018
A new flag has been added to the DYO Packing List screen.
9. Printing Sequence
The possible values are:
O=By Order+Line#
F=By 1st Line Bin+Order+Line#
A Global Setup flag (COP-Func-> Pick Ticket/Ship Labels-> 45. Default Printing Seq for DYO Pack List) has been added to determine the default value. If no default value is set up, the Printing Sequence will be set to "O."
Programs changed:
CP02S2X, XCOPASS1.DR, XPL0106, CPPKWORK (SL, FD, WS, DS, IO)
DLM
Related Articles
Feature - Add First Line Bin Number Sort to Picking Ticket
Release Date: 5/15/17 (Functionality of the F option was changed on 4/9/18) This feature allows the user to print picking tickets by first Order Line Bin number when printing picking tickets from COP--> Processing --> Print Pick/Pack Tickets --> ...
BM1501 Bill of Material Feature/Option Configuration Maintenance
BM1501 Bill of Material Feature/Option Configuration Maintenance ← Bill of Material / Work Order Plus Feature/Option Configuration File Maintenance Application Overview The Feature/Option Configuration File Maintenance application enables the user to ...
Clarify Laser Forms Line Item Level Barcode Printing
Q - What options should be used to print barcodes on line items on a laser form? I can easily print a barcode at the top or bottom of the page, but line item barcode options have confused me. A - Let's explain this by using a pick ticket, which has a ...
Feature - Print Packing List by Box Number
Release Date - 1/31/17 This feature will allow the user to print the packing list by box number when printing the packing list from Shipping Verification or when printing the packing list from the Shipment Data screen in Order Inquiry. A new option ...
Feature - EDI Profile to Print One Packing List Per Box from Shipment Verification
Release Date: 4/6/2018 Certain trading partners may impose a shipping rule requiring a packing list (for the entire order) be placed in each box of the shipment for that order. That is to say, if we have 6 boxes for an order, then we need to produce ...