Plus Work Order Transaction Can't Post

Plus Work Order Transaction Can't Post

Q: We have a Work Order showing the status as "Partial Rprt (100% complete)" but is not posted to show Complete. The pending transaction shows "Error: Exists Other Unposted Transaction" on both the Edit List and Post Journal. In Review the Order Inquiry, all operations reported properly. Can we force the system to complete the order?

A: Yes. The system provides an "Override Post for Exception" way to accomplish the order.   
1. You should be a high-level-permission operator.

2. At Production Transaction change mode, go to field # 5 "QTY Complete." You will see the
option  F5 (Override Post Excp). Hit F5 to override it.




3. 
 After that, press F5. Then, when you see the message below “Are You Sure To Proceed,” answer “Y.”

4. 
 Answer “Y’ to confirm that you want to “Override Posting Exception.”





5. 
After posting, you will see that the order status is marked “Complete.”


EMK







    • Related Articles

    • Work Order Plus Management Manual 9

      WIP Variance Report Application Overview The WIP Variance Report prints out the WIP Variance Amount, Standard Cost Variance Amount and Scrap Amount for each production transaction. The transactions are posted through the Post Production Transactions ...
    • Feature - Create Material Shortage Tracking with Plus Work Order

      'Release Date: 6/23/17 Currently, Elliott assumes the materials to be issued in Work Order Plus are the actual materials being used. If the user does not issue the material, Elliott simply assumes that the user does not need the materials, instead of ...
    • Work Order Plus Setup Manual 5

      8.8 Operator ID How to Access: Main Menu -> Util-Setup -> System File Main -> Maintenance -> Operator File (Figure 22) Operator Maintenance An Operator ID in Elliott can represent an individual operator or a crew. When it is used for a crew, it ...
    • Feature - Outside Services Improvement for Plus Work Order

      Release Date: 4/14/25 Version: 8.5 and Above This feature implements a new method for outside processing with Work Order Plus. This feature addresses several issues: It addresses that the issue is the cost of outside processing timing. It adds ...
    • BM1900 Bill of Material Post Production Transactions

      BM1900 Bill of Material Post Production Transactions ← Bill of Material / Work Order Plus Post Production Transactions Application Overview The Post Production Transactions application updates inventory levels of component and parent items based on ...