Feature - WO Plus Allow Add New Material with Zero Quantity and Create Allocation to the New Product

Feature - WO Plus Allow Add New Material with Zero Quantity and Create Allocation to the New Product

Release Date: 8/25/21

Version: 8.5 and Above

If a user wants to add an item that is not on the original bill of material to a Plus Production Work Order during Production Transaction Processing, Elliott allows that but does NOT allow the user to report a quantity of zero. This change will allow the user to add an item with a quantity of zero. As a result, the required item is now on the production order and the quantity is allocated for this production order. This option will only be available if using shortages and Global Setup-> BOMP Global Control-> Screen 3-> 14. Enforce Material Verification in Production is set to N.

During Production Transaction Processing, a component can be added with a quantity of zero.


The added component is shown in the component list with the quantity of zero and the shortage amount.


Posting the transaction will create a shortage transaction hold ID for the shortage quantity.


Processing another production transaction will show the added component and allow the entry of a quantity used.


This will post and update the hold transaction or remove it if the entire shortage was fulfilled.


Programs Modified: BMMTLMN3, BM19P3, SYINVAL3

CLS




    • Related Articles

    • BM1800 Bill of Material Production Transaction Processing

      BM1800 Bill of Material Production Transaction Processing ← Bill of Material / Work Order Plus Production Transaction Processing Application Overview The Production Transaction Processing application allows for reporting progress made toward ...
    • Feature - Create Material Shortage Tracking with Plus Work Order

      'Release Date: 6/23/17 Currently, Elliott assumes the materials to be issued in Work Order Plus are the actual materials being used. If the user does not issue the material, Elliott simply assumes that the user does not need the materials, instead of ...
    • Feature - Use F2=Labor Only When Reporting Zero Qty in Plus WO Time Clock Reporting

      Release date: 11/6/2020 Version 8.5 & Up In Plus Work Order, Work Order Production Reporting for the time clock operation, the user can choose "Qty Completed" = 0. This will stop the time clock for either that operation or the previous operation ...
    • BM1700 Bill of Material Production Order Entry

      BM1700 Bill of Material Production Order Entry ← Bill of Material / Work Order Plus Processing Production Order Entry Application Overview The Production Order Entry application allows the entry of production orders. These orders may be later ...
    • BMWOPROD Bill of Material Work Order Production

      Work Order Production How to Access: Main Menu > Distribution > Bill of Material Processor > Maintenance > Work Order Production Work Order Production, Typing Mode This is the Time Clock Interface for Work Order Reporting. It is for workers who ...