Release Date: 6/22/16

The BOMP Routing file maintenance screen has been modified so that when the Cost version of the screen is active, two new function keys are now available.  Pressing F2 will toggle the Operation and Routing fields between Std, Avg, and Lst values.  The Total value will also be updated. 

Pressing F7 will allow entry of the Labor and Burden values.  The Routing and Total fields will be updated to reflect the changes.  These Labor and Burden values will be saved for the Std, Avg, and Lst versions of the screen and will be saved until the user escapes back to the Routing # field.


Modified Programs:  BMRTGMNT

DLM






    • Related Articles

    • Feature - Enhanced Production Routing File Bill of Material Screen

      Date Released - 02/1/16 When in Routing Maintenance (Distribution-> Bill of Material Processor-> Maintenance-> Production Routing File-> Maintenance) and the F1 key is pressed to display the Bill of Material associated with an operation that has a ...
    • BMRTGMNU Bill of Material Production Routing

      Production Routing Run Instructions Select Production Routing File from the pull down BOMP Maintenance window. The following screen will be displayed: Routing Maintenance Screen Production Routing describes how each parent item is manufactured, step ...
    • BMITMVRS Bill of Material Production Cost Variance Report

      Production Cost Variance Report Application Overview The Production Cost Variance Report prints the cost variance between planned cost and actual production cost for selected items. Planned production cost is calculated based on the routing for each ...
    • BM1700 Bill of Material Production Order Entry

      BM1700 Bill of Material Production Order Entry ← Bill of Material / Work Order Plus Processing Production Order Entry Application Overview The Production Order Entry application allows the entry of production orders. These orders may be later ...
    • NSCTLMN3 Bill of Material and Production Order Global Control Setup

      Global Setup BOMP Global Control Elliott Main > Global Setup > Dist > BOMP Global Control Figure 3A.1 shows the setup screen BOMP Global Control 1. Copy Regular Cop Orders Into BOMP This enhancement allows you to copy a regular order with ...