Feature - Option to Use Order or Routing Notes in Plus Work Order Inquiry

Feature - Option to Use Order or Routing Notes in Plus Work Order Inquiry

Release Date - 3/22/19

Version: 8.2 and up

The feature allows the user to choose which file notes are attached when the initial Plus Work Order Inquiry screen is displayed. This option is controlled through a new Global Setup option. Go to System Utilities-> Global Setup-> System-> Note Function-> Screen 2-> Field 26. Plus Work Order Inquiry Initial Note Option.



  26. Plus Work Order Inquiry Initial Note Option - The options are R=Work Order Routing Note W=Work Order Note. The default value is "R." Choosing this option will attach notes to the Production Order Routing file (BMORDRTG). If the "W" option is chosen, the note shown or added will be attached to Production Order file (BMORDFIL).

 
 
This is indicated by the reference information shown on the bottom right hand corner of the Elliott Note Maintenance window.

Programs Modified: NSCTLFIL.FD, NSCTLFIL.W32, NSCTLINI, NSCTLMN1, BMPORDIQ.
CLS


    • Related Articles

    • Work Order Plus Questions and Answers

      Q - What is the difference between the three types of work orders that are mentioned in the documentation? What are the ability/ benefits to use different types at the same time? Plus Work Order Material Work Order Legacy Work Order A - Here is the ...
    • Work Order Plus Advanced Feature Manual 1

      Work Order Plus Advanced Feature Manual Chapter 1: Utilities Print Costed Bill of Material Application Overview Run Instructions Purge Complete Production Orders Application Overview Run Instructions Standard Product Routing Export Application ...
    • Work Order Plus Advanced Feature Manual 9

      Chapter 3: Advanced Features Exception Handling Mistakes occur on a daily basis preventing us from collecting accurate information, accidentally and intentionally. For example, an operator may forget to log off at the end of the day or forget to log ...
    • Work Order Plus Setup Manual 6

      8.9 Special Operation How to Access: Main Menu -> Distribution -> Bill of Material Processor -> Maintenance -> Special Operation File (Figure 25) Special Operation In Work Order Plus, every action is defined as a 4-digit number so operators can use ...
    • Work Order Plus Production Manual 2

      Chapter 2: Create a Work Order Work orders in WO+ can assist with tracking production, but there are several ways to create the work order depending on the situation. Production Order Entry - The traditional way to create work orders, mostly to ...