Feature - Material Production History Security Logic for Print Cost

Feature - Material Production History Security Logic for Print Cost


Release date: 11/15/2022

Version: 8.5 & Up

For BOMP / Report / Production History Report / Print / Material Work orders, security logic has been added to the screen program BM31S2 for the "13. Print Cost  " field.

The security setup field used by this feature can be found in System Utilities / Utility / Password Setup / Global Security / User Global Security / Change.  Enter User ID,  Then on screen 6, field "14. Allow User See Item Cost with BOMP Plus WO" can be set to "N" if the user is not authorized to see costs on the Material Production History report.



If the Security setup field 14 is set to "Y," the Material Production History Report field "13. Print Cost?" will default to "Y." 



If the Security setup field 14 is set to "N," the Material Production History Report field "13. Print Cost?"   will default to "N/A."



Modified program: BM31S2

DLM


    • Related Articles

    • BMRTGMNU Bill of Material Production Routing

      Production Routing Run Instructions Select Production Routing File from the pull down BOMP Maintenance window. The following screen will be displayed: Routing Maintenance Screen Production Routing describes how each parent item is manufactured, step ...
    • BM1800 Bill of Material Production Transaction Processing

      BM1800 Bill of Material Production Transaction Processing ← Bill of Material / Work Order Plus Production Transaction Processing Application Overview The Production Transaction Processing application allows for reporting progress made toward ...
    • BMWORSCN Bill of Material Production History Report for WO+

      Production History Report for WO+ Application Overview The Production Transaction History Report prints production transactions reported for selected production orders. It prints the number of items reported in each transaction and the total amount ...
    • BM1900 Bill of Material Post Production Transactions

      BM1900 Bill of Material Post Production Transactions ← Bill of Material / Work Order Plus Post Production Transactions Application Overview The Post Production Transactions application updates inventory levels of component and parent items based on ...
    • BMITMVRS Bill of Material Production Cost Variance Report

      Production Cost Variance Report Application Overview The Production Cost Variance Report prints the cost variance between planned cost and actual production cost for selected items. Planned production cost is calculated based on the routing for each ...