Feature - Gross Requirements to Use COP Order Customized Structure

Feature - Gross Requirements to Use COP Order Customized Structure

Release Date: 03/25/2022
Version: 8.5 & Higher

In the COP Order Entry Line Item Screen, the user can press "F4=Custom Prod Stru" key to customize the components needed to produce the parent item for this order.  See sample screen below:


In BOMP -> Reports -> Gross Requirements Report, the user can import from a sales order as a shortcut to entering a list of item and quantity.


In the past, even though the components structure may have been customized in the COP Line Item screen, the gross requirements report still used the standard material structure to produce the gross requirements report.

With this enhancement, the system will now look to see if the COP line item component structure is customized.  If it is customized, the system will use the customized structure in the COP line item to generate the gross requirements report. We now support the following four types of customized structures in COP line items:
  1. Material Work Order Component Structure
  2. Plus Work Order Component Structure
  3. Kit Component Structure (Super Kit)
  4. Feature Option Structure
In addition, in the gross requirements report, we will indicate if the parent line item comes from a sales order. See sample screen below:

In the above example, the first parent item #0 107 110 6128 is from sales order #140362 and is customized.  The second parent item #0 107 110 6128 is entered manually into the gross requirements report and hence does not show the sales order # info.  The last item #0 107 110 6128K is a kit parent item with product structure defined in sales order #140362.


Modified Programs: BMREQWRK.FD, BM1100, BM11P1
EMK


    • Related Articles

    • Feature - Gross Requirements Report COP Order Import

      Date Released - 5/24/16 The feature will allow the user to import COP line items to the BOMP Requirements Work File. When running the Bill of Material Processor-> Reports-> Gross Requirements Report, a new option is available from the item number ...
    • BM1100 Bill of Material Gross Requirements Report

      BM1100 Bill of Material Gross Requirements Report ← Bill of Material / Work Order Plus Gross Requirements Report Application Overview The Gross Requirements Report application prints a selected number of levels of components for a selected quantity ...
    • Feature - Plus Work Order CSV Import With Customized Components

      Release Date: 4/28/23 Version: 8.5 and Above The existing Plus Work Order CSV import program allows the user to create Plus Work Orders based on the default product structure and routing. This feature will allow the user to create a Plus Work Order ...
    • IM32S1 Inventory Management Kit Gross Requirements Report

      Kit Gross Requirements Report Application Overview The Kit Gross Requirements Report application prints the requirements for each component for a selected quantity of a kit item or items. The report allows the user to see how many of each component ...
    • Elliott 8 Directory Structure and NTFS Rights

      Revised: 04/19/2022 Version: 8.0 & above In recent years, we have noticed many outbreaks of "ransomware," which first attacks one of the workstations on your LAN through e-mails. Once the workstation is affected, the ransomware will encrypt various ...