Feature - Gross Requirements Report COP Order Import

Feature - Gross Requirements Report COP Order Import

Date Released - 5/24/16

The feature will allow the user to import COP line items to the BOMP Requirements Work File. When running the Bill of Material Processor-> Reports-> Gross Requirements Report, a new option is available from the item number field if the Customer Order Processing module is enabled.


    

F4=Order Import - When the users presses the F4 key, a window will pop up asking the user to enter the order number they would like to import.


COP Order No - Enter the COP order number that you would like to import. Once the order number is entered, the application will verify that the COP Order is on file in the Order Header File. If it is not, the user will receive an error message stating that the order is not on file. If it is on file, it will verify that the order is an "I," "O," or "Q" type order. Only these types of orders can be imported. If the order type is valid, the application will check if the order is partially posted. If it is partially posted, the user will receive the following message:


If the user answers N to the prompt, partially posted quantities will not be used when computing the quantity of the parent in the BOMP Requirements Work File. For example, if order 100 has three line items.

Item

Quantity Ordered

Quantity Shipped

A

3

1

B

4

0

C

5

5

If the user answers Y to Include Partially Posted Line Items, the following quantity will be written to the BOMP Requirements Work File:
Item A - quantity of 3
Item B - quantity of 4
Item C - quantity of 5

If the user answers Y to Include Partially Posted Line Items, the following quantity will be written to the BOMP Requirements Work File:
Item A - quantity of 2
Item B - quantity of 4
 

If the COP Order Number is the first "item" entered, the user will be returned to the location field and the remaining report parameters can be entered. If the COP Order Number is not the first "item" number entered, the user will be returned to the Any Changes field. Once the user enters past the Item Number To Change or answers N to Any Changes, the item numbers from the COP Order Line Item file will be imported and added to the list of items to process.  

Programs Modified: BM1100
CLS




    • Related Articles

    • All of a Sudden COP Open Order Report Takes Forever to Complete

      Q - I have been running COP / Reports / Order Status Reports / Open Order Report / All Items / By Customer Sequence. A couple of weeks ago, this report's run time all of a sudden jumped exponentially (like from 10 seconds before it was done to, now, ...
    • Feature - Gross Requirements to Use COP Order Customized Structure

      Release Date: 03/25/2022 Version: 8.5 & Higher In the COP Order Entry Line Item Screen, the user can press "F4=Custom Prod Stru" key to customize the components needed to produce the parent item for this order. See sample screen below: In BOMP -> ...
    • APINVIMS Accounts Payable Invoice Import Utility

      A/P Invoice Import Utility Introduction This utility is similar to the COP Sales Order Import Utility. It will allow vendor invoices created through an external source to be imported and become New A/P Transactions in Elliott. Traditionally, if a ...
    • AP07S1 Accounts Payable Cash Requirements Report

      Cash Requirements Report Application Overview The Cash Requirements Report can be used to determine, on a general basis, which invoices can be paid with the available cash or to determine exactly how much cash would be required to bring your A/P up ...
    • Feature - Gross Requirements Report Item/Qty CSV Import

      Date Released - 5/23/16 The feature will allow the user to import an CSV file containing a list of items and the quantity of the parent. This CSV file should contain two columns - the item number and the quantity of the parent. When running the Bill ...