Feature - Default Value For Create Variance Prompt
Date Released - 11/23/16
This feature allows the user to set the default value for the Create Variance Account Entry for Under/Over Billed Item when entering a voucher in Accounts Payable. Previously this prompt defaulted to N.
A new option has been added to Util-Setup-> Global Setup-> Acct-> A/P Global Control-> Screen 2 option 22.
The default value for this option is Y.
This option controls the default value for the following prompt:
If the user presses the Return/Enter key, this default value will be used.
Programs Modified: NSCTLFIL.FD, NSCTLFIL.W30, NSCLTMN2, AP0201
CLS
Related Articles
Feature - Attribute File Maintenance Create Other Attributes
Release Date: 4/4/25 Version: 8.5 and Above System File Setup-> Maintenance-> Attribute File-> Create now supports the option Other Attributes. Choosing this option will give the user the option to create other attributes used by Elliott for various ...
BM1601 Bill of Material Feature/Option Configuration Inquiry
BM1601 Bill of Material Feature/Option Configuration Inquiry ← Bill of Material / Work Order Plus Feature/Option Configuration Inquiry Application Overview The Feature/Option Configuration Inquiry application provides an easy way to display various ...
BM1501 Bill of Material Feature/Option Configuration Maintenance
BM1501 Bill of Material Feature/Option Configuration Maintenance ← Bill of Material / Work Order Plus Feature/Option Configuration File Maintenance Application Overview The Feature/Option Configuration File Maintenance application enables the user to ...
Can System Default Item User-Defined Code?
Q - When I add an item, can the system automatically default field "4. User Def Code" to "1"? See sample screen below: A - Yes, you can do so by first defining an item "DEFAULT-ITEM." Set the field "4. User Def Code" to "1." See sample screen below: ...
BMITMVRS Bill of Material Production Cost Variance Report
Production Cost Variance Report Application Overview The Production Cost Variance Report prints the cost variance between planned cost and actual production cost for selected items. Planned production cost is calculated based on the routing for each ...