This feature allows the user to change the pre comment entered for an operation when entering the post comment. This is enabled via System Utilities-> Global Setup-> Dist-> BOMP Global Control-> Screen 7-> Field 11. Allow Editing Pre-Comment When Enter Post-Comment.
11. Allow Editing Pre-Comment When Enter Post-Comment - Default is N. If set to Y, the user will have the ability to enter the pre comment at the time a post comment is entered if the operation or special operation is configured to prompt for the pre and post comment.
The entry of pre and post comments for operations used during the production of a plus work order is enabled for an operation via Bill of Material Processor->Maintenance-> Product Routing File-> fields Prompt Pre Comment and Prompt Post Cmt.
This can also be changed on a work order by work order basis by modifying the settings once the routing is copied to the work order.
The entry of pre and post comments for special operations is enabled for an operation via Bill of Material Processor->Maintenance-> Special Operation File-> fields 5. Prompt For Pre-Comment and 6. Prompt For Post-Comment.
If both flags are set to Y for either the product routing operation or the special operation and 11. Allow Editing Pre-Comment When Enter Post-Comment is set to Y, the user will be have the ability to override the pre comment when ending a production operation or a special operation.
Programs Modified: BMWOPROD.CBL, BMWPUTIL.PL, BMWPUTIL.WS, BMWPUTIL.CBL, NSCTLFIL.FD, NSCTLFIL.W41, NSCTLINI, NSCTLMN3
Programs Added: BMCOMEVT.WS, BMCOMEVT.PL