Feature - Add Status Totals to Material Production Schedule Report
'
Release date: 11/3/2020
Version 8.5 & Up
In BOMP -> Reports
-> Production Schedule Report, totals by status have been added, including percent of total orders.
Modified program: BM25P3.CBL
DLM
Related Articles
BM1700 Bill of Material Production Order Entry
BM1700 Bill of Material Production Order Entry ← Bill of Material / Work Order Plus Processing Production Order Entry Application Overview The Production Order Entry application allows the entry of production orders. These orders may be later ...
BMSCHSCN Bill of Material Production Schedule Report
Production Schedule Report Application Overview The Production Schedule Report prints a list of items scheduled to be produced. These items are entered through orders in the Production Order Entry application, copied from Customer Order Processing, ...
Feature - Export BOMP Material WO Production Scheduled Report to CSV
Release Date: 11/10/2022 Version: 8.5 and Up A new feature has been added to allow Export of the BOMP Material WO Production Scheduled Report data to a CSV file. There are two new setup fields in Global Setup / Dist / BOMP global control / Screen 7 ...
Feature - Production Schedule Report CSV Export Notes as a Concatenated Column
Release Date: 04/05/2024 Version: 8.5 & Up Background The key Elliott concept to understand this feature is to understand Notes. Elliott users may be familiar with the use of Notes in various places in Elliott. If not, check out this article on ...
BM1800 Bill of Material Production Transaction Processing
BM1800 Bill of Material Production Transaction Processing ← Bill of Material / Work Order Plus Production Transaction Processing Application Overview The Production Transaction Processing application allows for reporting progress made toward ...