BMDPTMNT Bill of Material Department Maintenance

BMDPTMNT Bill of Material Department Maintenance

Department Maintenance

 

Run Instructions

 

Select Department File from the pull down BOMP Maintenance window.  The following screen will be displayed:

           

 


 

Department Maintenance Screen

 

 

A Department can be a building or floor in the company, a group of work centers, or a group of operators or workers.  The Department ID field can be found in both the Work Center file and the Operator file, which acts as a group ID.  So, you can have “Department of the Work Center” and “Department of Operator.” They can share the same ID or have different ones.

 

Departments can be used for the following:

  • A Department can be an analysis, evaluation and management unit for a group of work centers or a group of operators.
  • Managers can monitor the status of work centers in a department.
  • An operator can report labor for a department with multiple work centers.  The labor of this operator will be automatically distributed to all the work centers.
  • Department managers can have special rights to handle exceptions happening in the department.
  • The Department provides default values when adding a new work center.

 

All the fields in this table are similar to those in the Work Center file, except for Department ID (4 alpha-numeric characters) and Description (30 alpha-numeric characters), so the detail of each field will be described in the Work Center section.  This means the Department can provide default values when adding a Work Center.

 

Departments can be based on your company’s physical departments, but may refer to a virtual department.  You may already have departments in Shop Floor and can use the entries to create departments in BOMP.  The department tables for these two modules are separate and serve only their respective module.



    • Related Articles

    • BMDPTIME Bill of Material Department Time Clock

      Department Time Clock How to Access: Main Menu è Distribution è Bill of Material Processor è Maintenance è Department Time Clock Department Time Clock, 1st Stage This is the Time Clock Interface for a Department. It allows an operator to clock into a ...
    • BM0100 Bill of Material Product Structure File Maintenance

      BM0100 Bill of Material Product Structure File Maintenance ← Bill of Material / Work Order Plus Product Structure File Maintenance Application Overview This application enables the user to maintain the Product Structure File. Numbers of related ...
    • BMWCMNT Bill of Material Work Center Maintenance

      Work Center Run Instructions Select Work Center File from the pull down BOMP Maintenance window. The following screen will be displayed: Work Center Maintenance Screen Work Center can be regarded as a single machine, multiple machines that are ...
    • BM0000 Bill of Material Package Overview

      BM0000 Bill of Material Package Overview ← Bill of Material / Work Order Plus Overview Package Overview How To Use This Manual When most people receive a new product, they want to use it right away. Unfortunately, this is not quite possible when ...
    • BMWOPROD Bill of Material Work Order Production

      Work Order Production How to Access: Main Menu > Distribution > Bill of Material Processor > Maintenance > Work Order Production Work Order Production, Typing Mode This is the Time Clock Interface for Work Order Reporting. It is for workers who ...