BM01S1 Bill of Material Audit Trail Report

BM01S1 Bill of Material Audit Trail Report

Audit Trail Report

Application Overview

 

The Audit Trail Report can be printed at any time showing all additions, changes and deletions to the Product Structure File.

 

Run Instructions

 

Select Audit Trail Report from the pull down BOMP Maintenance window.  The following screen will be displayed:

 


 

Audit Trail Report Entry Screen

 

 

 The following options are available:

    • Select the desired mode from the Audit Trail Report menu bar
    • Enter the data requested on the screen

     

     

    To return to the menu bar, press the ESC or F10 key. To leave this application, press X for EXIT when positioned at the menu bar.

     



    Entry Field Descriptions

     

    Name

    Type and Description

    1.      Starting Item No

    15 alphanumeric characters.

    Enter the item number of the first item for which you wish to print an Audit Trail Report. Default is All.

    2.      Ending Item No

    15 alphanumeric characters.

    Enter the item number of the last item for which you wish to print an Audit Trail Report.

    Default is the starting item number.

    3.      Starting Date

    A date in the standard date format.

    Enter the starting date in the range you want to print, or press RETURN to default to All dates.

    4.      Ending Date

    A date in the standard date format.

    Enter the ending date in the range you want to print.  The default is the starting date.

    5.      Purge File ?

    Y or N.

    Enter Y to purge the file or N to decline.  Default is N.





     

    Audit Trail Report


     

                          

     

     

     

     

     

     



      • Related Articles

      • BM0600 Bill of Material Indented Bill of Material Report

        BM0600 Bill of Material Indented Bill of Material Report ← Bill of Material / Work Order Plus Indented Bill of Material Report Application Overview The Indented Bill Of Material Report prints a selected number of levels of the components for a ...
      • BM0000 Bill of Material Package Overview

        BM0000 Bill of Material Package Overview ← Bill of Material / Work Order Plus Overview Package Overview How To Use This Manual When most people receive a new product, they want to use it right away. Unfortunately, this is not quite possible when ...
      • PO05S1 Purchase Order and Receiving Receivings Audit Trail Report

        Receivings Audit Trail Report Application Overview You may print the Receivings Audit Trail Report as often as you like. It may be printed for a range of purchase order numbers, item numbers and receipt dates. This report lists a great deal of ...
      • BMWIPSCN Bill of Material WIP Report

        WIP Report Application Overview After production has started and before work orders are closed, the WIP Account may contain an amount. This WIP Report will print all unfinished work orders and their WIP amount. The summary format prints one line per ...
      • BMPRDANL Bill of Material Labor Performance Report

        Labor Performance Report Application Overview The Labor Performance Report prints the productivity of each selected operator. The operator’s time is categorized into 4 types: productive, non-productive, break time (payable break) and meal break time ...