Plus WO - Link the PO cost to the Outside Operation FOB Cost
There is already a link between the WO Plus Outside Operation to the PO Line. The WO Outside Operation Cost is not populated. I sugest to do it (and user can change),
The following post was created by Avi Weissbard from Cybermac software LLC on 5/3/2024 in our old Knowledge Base.