Move Landed Cost Calculation report to show in PO

Move Landed Cost Calculation report to show in PO

Although the Landed cost calculation report is run from the PO module, it is currently grouped with the IM reports in the Spool manager. I suggest that the report should be renamed to that it is listed with the PO reports.

The following post was created by Daniel Knopp from Design Works Crafts Inc.on 8/29/2016 in our old Knowledge Base.