Defer processing - Using it with system period control and system Date

Defer processing - Using it with system period control and system Date

Being able to select Starting and Ending date in deferred processing would be a nice tool to have as it is Pre-defined. The accounting department runs the same reports every month and only the starting and ending Dates change. Does or can this feature be added easily? Also the option of running a report using the system date in Deferred processing would be helpful.

The following post was created by A Barthel from Elbe & Sohn Inc. on 11/12/2018 in our old Knowledge Base.